The vacuum is turned up to the needed level close the pressure knob and testing for leaks of the valves, and joints shall be completed. The piping joints shall be wrapped using the insulating paper, and lastly, the walls shall be sealed with polyurethane foam. The wires shall be fastened http://cruztomaf.arwebo.com/24948580/window-ac-installation-valley-village-for-dummies