A lot more generally, the operator would need to "jog" the Command, shifting the cab in modest increments until finally the elevator was fairly near the landing point. Then the operator would direct the outgoing and incoming passengers to "view the stage". At a mean of $a hundred to https://attic10864.verybigblog.com/27784741/lift-no-further-a-mystery