At first, the Jai Hind metro station was planned to generally be elevated. Nonetheless, the AAI objected the elevated extend up to the airport may pose a threat to aircraft, so the route was additional reworked along with the station was shifted underground, one hundred fifty m through the Airport terminal https://railwaykolkata47924.glifeblog.com/31284914/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf