1

About Construction engineering Bangladesh

News Discuss 
For incredibly hard or rock-variety soils, fifty SPT N-Vales are desirable. So, we continue to gather the SPT blows around ideal depth wherever fifty SPT N Values are obtained. In the case of the deep foundation, we look for a minimum of a 6m depth hard soil layer under where https://anned257uvw1.blog-ezine.com/profile

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story