Penmann recently finalised a tailored HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a fully engineered ventilation and climate control system designed to satisfy stringent hygiene and production criteria. The scope included the complete lifecycle delivery of cutting-edge HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. https://tinybookmarks.com/story20628172/penmann-delivers-major-hvac-upgrade-for-nutricia-s-liverpool-site-supporting-fsi-phase-1-2