Penmann has completed a tailored HVAC upgrade at Nutricia’s Liverpool facility, implementing a purpose-built ventilation and climate control system built to comply with demanding hygiene and production standards. The scope included the design, supply, installation and commissioning of high-specification HVAC systems across civil, Medium Care (MC) and High Care (HC) https://hylistings.com/story21918561/the-penmann-team-completes-major-hvac-upgrade-for-the-liverpool-based-nutricia-facility-to-align-with-the-fsi-development-programme