Starting off load: Motors need to have to accommodate the starting up load, which can be significantly higher than functioning load. Location it up was astonishingly straightforward. The involved speed controller and electrical power plug built wiring basic, and the 10mm shaft in shape perfectly into my screening rig. On https://www.china-develop.com/products/dp-automation-central-motor-electronic-brake-180nm